Case study analysis of legal and institutional obstacles and incentives to the development of the hydroelectric potential at Goose River, Maine
Read Online
Share

Case study analysis of legal and institutional obstacles and incentives to the development of the hydroelectric potential at Goose River, Maine

  • 916 Want to read
  • ·
  • 17 Currently reading

Published by U.S. Dept. of Energy, Assistant Secretary of Rescource [sic] Applications, Industrial and Utility Applications and Operations, Division of Hydroelectric Resources Development, Available from National Technical Information Service in Washington, D.C, Springfield, Va .
Written in English

Subjects:

  • Water resources development -- Maine,
  • Hydroelectric power plants -- Maine

Book details:

Edition Notes

Statementprepared by The Energy Law Institute, Franklin Pierce Law Center, under contract no. AS02-78RA04934
ContributionsUnited States. Dept. of Energy. Division of Hydroelectric Resources Development, Franklin Pierce Law Center. Energy Law Institute
The Physical Object
Pagination82 p. ;
Number of Pages82
ID Numbers
Open LibraryOL14885467M

Download Case study analysis of legal and institutional obstacles and incentives to the development of the hydroelectric potential at Goose River, Maine

PDF EPUB FB2 MOBI RTF